Good practices for cabling planning and install in the internal and external plant

  • Region: EMEA
  • Category: Enterprise Networks
  • Language: Spanish
  • 72 minutes

In this webinar replay Alberto Martinez covers aspects related to the sizing of conduits, the separation between power conduits and weak currents, the sizing of rooms and technical rooms as well as the density and planning of the racks, and the different types of communication cables in external plants.

Note: This webinar is only available in Spanish

Webinar Presenter

 
Alberto Martínez System Engineer Manager for Southern Europe and Benelux CommScope

View the Spanish webinar replay: